The project
Project
Final Design
The restoration work on the Donizetti Theater in Bergamo lasted nearly three years, beginning on February 5, 2018, and ending in November 2020 (with the only delays caused by the pandemic and the staging of the opera *L’ange de Nisida* on the theater’s construction site in November 2019, and with only minor changes to the original design).
The theater’s restoration and architectural revitalization project arose primarily from the need to bring the building into compliance with safety regulations. In addition to the technical aspects, the theater’s structure itself—with the exception of its monumental façade—did not align with the aesthetic character of the city’s historic fabric. Therefore, alongside the work to bring the theater up to code and streamline its functions, it was necessary to undertake a comprehensive architectural intervention capable of breathing new life into the building.
Timeline of the Operation
The need to undertake a restoration project became apparent as early as the 1990s. During the Bruni administration, an international competition was held for the preliminary renovation design, which was awarded to the Temporary Association of Professionals coordinated by Engineer Nicola Berlucchi of Studio Berlucchi in Brescia.
In the years that followed, the Tentorio administration developed the preliminary design into a final design and established the operational framework necessary for fundraising and the future management of the theater seasons. The main problem, in fact, is securing funding: the total cost of the project is estimated at around 18 million euros, for which it is currently impossible to secure public funding, except for a minor portion. In early 2014, the “Fondazione Teatro Donizetti di Bergamo” was therefore established, with the goal of raising the funds needed for the renovation. The Gori administration took up the baton and carried out the project in collaboration with the newly established Foundation.
The project, designed by Studio Berlucchi of Brescia, was awarded to Fantino Costruzioni Spa (parent company) in a temporary joint venture (ATI) with Notarimpresa Spa.
The procedure
The work involved the entire structure and was primarily aimed at creating rooms for the orchestra in the area beneath the stalls, a movable orchestra pit, a new building wing for the dressing rooms, a new box office, as well as the construction from scratch of the main bar and the bar for gallery patrons. Also new are the west wing, which houses offices, rehearsal rooms, catering facilities, and spaces for public activities. All the boxes, the ceiling of the stalls, and the foyer ceiling have been completely restored.
The detailed design consisted of five main thematic areas:
1. Architectural Design
2. Restoration Design
3. Structural Design
4. Mechanical, Electrical, and Plumbing Design
5. Safety and Coordination Plan
Architectural Restoration
Architectural restoration to ensure the building’s safety and bring it into compliance with fire safety regulations. With this in mind, the basement was reorganized to create a new underground water storage tank near Piazza Cavour in order to install a new automatic fire suppression system.
Renovation of the exterior facades
Renovation of the exterior facades through the pursuit of formal coherence among the building volumes, with the aim of creating a unified and contemporary architectural image for the theater, while respecting yet at the same time harmonizing the historic elements. In particular, the facade facing Piazza Cavour was redesigned.
Functional Renovation
The renovation work involved the functional reorganization of the spaces, the reorganization of the entrances for the public and staff, the ground-floor foyers, the connections between all floors open to the public, and most of the backstage service areas corresponding to the east and west side extensions, as well as a reorganization of all technical spaces in the basement. The reorganization also included the relocation of the new ticket office.
Upgrade of the air conditioning and ventilation system
Renovation project to upgrade the theater’s air conditioning and ventilation system. The floor slab of the stalls was demolished and rebuilt to install a localized floor-mounted air supply system. The seats in the boxes were replaced and repositioned in accordance with fire safety regulations. The area beneath the floor also underwent a radical transformation. The existing seats in the main auditorium were replaced with new seats that are entirely Class 1IM fire-resistant and upholstered in fire-retardant red velvet. The air conditioning, smoke detection, and fire suppression systems in the private boxes were also upgraded, in addition to the renovation of the flooring and wall finishes.
Office Reorganization
Relocation of the administrative offices to the expanded West Wing.
Rearrangement of the dressing rooms and backstage areas
Rearrangement of the dressing rooms and backstage service areas to restore the layout and functional logic that had been compromised by the disjointed renovations carried out in the past. This required the demolition of the building wing on the east side of the stage tower and the subsequent construction of a new building wing, which now houses four floors of dressing rooms, the costume shop, and several technical rooms.
Restoration Project for the Theater Auditorium and the Entrance Foyer
Restoration work on the theater auditorium and the entrance foyer was carried out following a thorough investigation that made it possible to reconstruct the stratigraphy of the decorative paintings.
Optimizing the Acoustics of a Theater
Optimization of the theater’s acoustics. As part of the restoration, great attention was paid to improving the acoustic quality of the theater.
Architectural restoration to ensure the building’s safety and bring it into compliance with fire safety regulations. With this in mind, the basement was reorganized to create a new underground water storage tank near Piazza Cavour in order to install a new automatic fire suppression system.
Renovation of the exterior facades through the pursuit of formal coherence among the building volumes, with the aim of creating a unified and contemporary architectural image for the theater, while respecting yet at the same time harmonizing the historic elements. In particular, the facade facing Piazza Cavour was redesigned.
Functional Renovation: The renovation work focused on the functional reorganization of the spaces, the reorganization of the public and staff entrances, the ground-floor foyers, the connections between all floors open to the public, and most of the backstage service areas corresponding to the east and west side extensions, as well as a reorganization of all technical spaces in the basement. The reorganization also included the relocation of the new ticket office.
Renovation project to upgrade the theater’s air conditioning and ventilation system. The floor slab of the orchestra was demolished and rebuilt to install a localized floor-mounted air supply system. The seats in the boxes were replaced and repositioned in accordance with fire safety regulations. The area beneath the floor also underwent a radical transformation. The existing seats in the main auditorium were replaced with new seats that are entirely Class 1IM fire-resistant and upholstered in fire-retardant red velvet. The air conditioning, smoke detection, and fire suppression systems in the private boxes were also upgraded, in addition to the renovation of the flooring and wall finishes.
Reorganization of the offices, with the administrative offices being relocated to the expanded West wing.
Rearrangement of the dressing rooms and backstage service areas to restore the layout and functional logic that had been compromised by the disjointed renovations carried out in the past. This required the demolition of the building wing on the east side of the stage tower and the subsequent construction of a new building wing, which now houses four floors of dressing rooms, the costume shop, and several technical rooms.
Restoration work on the theater auditorium and the entrance foyer was carried out following a thorough investigation that made it possible to reconstruct the stratigraphy of the decorative paintings.
Optimization of the theater’s acoustics. As part of the restoration, great attention was paid to improving the acoustic quality of the theater.
With a cost of approximately 19 million euros, funded by public entities—including the Ministry of Cultural Heritage and Activities and Tourism, the City of Bergamo, and the Lombardy Region—as well as a significant contribution from private donors (thanks to the Art Bonus) totaling approximately 9.5 million euros—the total funding made it possible to address unforeseen issues and complete additional work beyond the original construction plan.
This truly impressive project was designed to transform the Donizetti into a modern theater, in compliance with the latest safety regulations, but above all to create a gathering place independent of the performances on stage—a space the city can enjoy year-round in various areas.